Views: 32142 Author: Jeannie Publish Time: 2026-06-12 Origin: Site
【195】Air Hose Leak Shut Down Production for Half a Day – Fengchuang‘s Truss Layout Eliminates the Risk for Good
Keywords: Truss Layout Workshop Management Fengchuang Plastics Safety Production
Manager He is the equipment supervisor at a home appliance factory in Foshan. His worst fear is getting a call from the workshop in the middle of the night. Once, at 2 a.m., the shift leader called: “Manager He, the air hose on Line 3 burst – the whole line is down!” When He arrived, he found that a forklift had run over and punctured an air hose that had been dragging across the floor. He led the maintenance team in an emergency repair that took two hours to restore production. For that order, the customer deducted 5% of the payment due to the delay.
He had kept records: over the past year, there had been seven production stoppages caused by piping issues. Each time, the loss ranged from a few thousand to tens of thousands of RMB. He applied to his boss for a workshop piping renovation. The boss said, “Let’s make do for now. We’ll do it when orders pick up.” He felt powerless. He knew that the cost of “making do” was being paid all along – his boss just wasn’t counting it.
Later, He was sent by his company to audit Fengchuang Plastics as a potential supplier. When he walked into Fengchuang’s workshop, his first reaction was, “This doesn’t look like an injection molding shop.” There were no pipes on the floor at all. All water lines, air hoses, and electrical cables ran overhead on trusses, neatly arranged, with each type of line color-coded. Fengchuang’s workshop manager told him, “Before we renovated, we were just like you – pipes all over the floor, run over by forklifts, stepped on by workers, corroded by oil. Problems every few days. Since we installed the truss system, it’s been two years – not a single stoppage caused by a piping issue.”
When He returned, he presented his boss with a simple calculation: the truss renovation would cost ¥180,000 as a one‑time investment. But losses from piping‑related issues over the past year had exceeded ¥250,000. The boss saw the numbers and said, “Do it – now.” After the renovation was complete, He never again received a middle‑of‑the‑night emergency call. He says, “Truss layout isn’t about aesthetics. It’s about safety, it’s about efficiency, and it’s about money.”
Workshop air leaks, water leaks, and electrical issues causing constant stoppages? Fengchuang’s truss layout keeps all pipes and cables off the floor, eliminating safety hazards for good.